Knox County, TN Stormwater Management Manual: Volume 2
Whole Manual (pdf)
Chapter 1 Introduction (pdf)
Chapter 1 Addressing Stormwater Management Needs (pdf)
- 1.1 Impacts of Development and Stormwater Runoff
- 1.1.1 Development Changes Land and Runoff
- 1.1.2 Changes to Stream
- 1.1.3 Changes to Stream Geometry
- 1.1.4 Impacts to Aquatic Habitat
- 1.1.5 Water Quality Impacts
- 1.1.6 Stormwater Hotspots
- 1.1.7 Effects on Ponds, Lakes and Reservoirs
- 1.2 Addressing Stormwater Impacts
- 1.3 Comprehensive Stormwater Management Planning
- 1.4 Minimum Stormwater Management Standards
- 1.5 Stormwater Quality Treatment Rationale
- 1.5.1 Regulatory Overview
- 1.5.2 Attaining the Water Quality Standard
Chapter 2 Criteria for Stormwater Design (pdf)
- 2.1 Integrated Site Design Approach
- 2.1.1 Introduction
- 2.1.2 General Design Policies and Guidance
- 2.2 Stormwater Quality Management
- 2.2.1 General Requirements and Policies
- 2.2.2 Percent TSS Removal Values for Structural BMPs
- 2.2.3 Calculation of WQv and %TSS Removal
- 2.2.4 Calculation of %TSS Removal for BMPs in Parallel
- 2.2.5 Calculation of %TSS Removal for BMPs in Series
- 2.2.6 Calculation of %TSS Removal for Flow-through Situations
- 2.2.7 The Measurement and Calculation of Percent Imperviousness
- 2.2.8 Reducing the WQv
- 2.3 Channel Protection (CPv)
- 2.3.1 Background
- 2.3.2 Design Criteria and Policies
- 2.4 Stormwater Quantity Management
- 2.4.1 Overbank Flood Protection Criteria (Qp25)
- 2.4.2 Extreme Flood Protection (Qp100)
- 2.4.3 Downstream Impact Analysis
- 2.5 Stormwater Conveyance Design
- 2.5.1 General Criteria
- 2.5.2 Pipe Systems
- 2.5.3 Roadway Culverts
- 2.5.4 Open Channels
- 2.5.5 Outlet Protection
- 2.5.6 Gutters and Inlets
- 2.6 Bridge Requirements
Chapter 3 Stormwater Hydrology (pdf)
- 3.1 Introduction to Hydrologic Methods
- 3.1.1 Symbols and Definitions
- 3.1.2 Rainfall Estimation
- 3.1.3 Rational Method
- 3.1.4 Regression Methods
- 3.1.5 SCS Hydrologic Method
- 3.1.6 Clark Unit Hydrograph
- 3.1.7 Water Quality Calculations
- 3.1.8 Water Balance Calculations
- 3.1.9 Calculating Downstream Impacts (the Ten Percent Rule)
- 3.2 Storage Design
- 3.2.1 General Storage Concepts
- 3.2.2 Symbols and Definitions
- 3.2.3 Flood Protection Storage Design Procedures
- 3.2.4 Preliminary Detection Calculations
- 3.2.5 Estimation of the Channel Protection Volume
- 3.3 Outlet Structures
- 3.3.1 Symbols and Definitions
- 3.3.2 Primary Outlets
- 3.3.3 The Design of Extended Detention Outlets
- 3.3.4 The Design of Channel Protection Outlets
- 3.3.5 Multi-Stage Outlet Design
- 3.3.6 Trash Rack and Safety Grates
- 3.3.7 Secondary Outlets
Chapter 4 Design and Maintenance of Structural BMPs
- 4.1 Design Standards Policy
- 4.2 BMP Description and Selection Information
(Section 4.1 and 4.2 are part of one document. Please click on section 4.1 above to access this section)
- 4.2.1 General Application BMPs
- 4.2.2 Limited Application BMPs
- 4.2.3 Pollutant Removal Capabilities
- 4.2.4 Screening Process for General Application BMPs
- 4.2.5 Limited Application BMP Screening Process
- 4.2.6 Off-Line Versus On-Line Structural BMPs
- 4.2.7 Using Structural Stormwater BMPs in Series
- 4.3 General Application Stormwater BMPs
- 4.3.1 Stormwater Ponds
- 4.3.2 Conventional Dry Detention
- 4.3.3 Dry Extended Detention Ponds
- 4.3.4 Stormwater Wetlands
- 4.3.5 Bioretention Areas
- 4.3.6 Surface Sand Filters
- 4.3.7 Infiltration Trench
- 4.3.8 Enhanced Swales
- 4.3.9 Filter Strip
- 4.3.10 Grass Channel
- 4.3.11 Modular Porous Paver System
- 4.3.12 Porous Pavement
- 4.4 Limited Application Stormwater BMPs
Chapter 5 Stormwater Credits and Better Site Design Practices (pdf)
- 5.1 Introduction
- 5.2 Water Quality Volume (WQv) Credits
- 5.2.1 Introduction
- 5.2.2 Site Planning Using Stormwater Site Design Credits
- 5.2.3 General Policies for WQv Credits
- 5.2.4 Credit #1: Natural Area Preservation
- 5.2.5 Credit #2: Managed Open Space Preservation
- 5.2.6 Credit #3: Stream and Vegetated Buffers
- 5.2.7 Credit #4: Use of Vegetated Channels
- 5.2.8 Credit #5: Impervious Area Disconnection
- 5.2.9 Credit #6: Environmentally Sensitive Large Lot Neighborhoods
- 5.3 Better Site Design Practices
- 5.3.1 Overview
- 5.3.2 Incorporating Better Site Design Practices into Site Design Process
- 5.3.3 Discussion of Better Site Design Practices
- 5.3.4 Conservation of Natural Features and Resources
- 5.3.5 Low Impact Site Design Techniques
- 5.3.6 Reduction of Impervious Cover
- 5.3.7 Using Natural Features for Stormwater Management
- 5.3.8 Better Site Design Examples
Chapter 6 Water Quality Buffers (pdf)
- 6.1 Introduction
- 6.2 Applicability
- 6.2.1 Community Waters Definition
- 6.3 Buffer Zones and Widths
- 6.3.1 Zones
- 6.3.2 Widths
- 6.3.3 Width Requirements for Steep Slopes
- 6.4 Vegetation and Enhancement Requirements
- 6.4.1 Inner Zone (Streams and Wetlands)
- 6.4.2 Outer Zone (Streams and Ponds/Lakes)
- 6.4.3 Non-native and Invasive Vegetation
- 6.4.4 Buffer Enhancement Requirements
- 6.5 Water Quality Buffer Averaging
- 6.5.1 Requirements and Policies
- 6.5.2 Areas Where Buffer Averaging is Prohibited
- 6.5.3 Example Calculation
- 6.6 Use of Buffer Areas
- 6.6.1 Prohibited Uses
- 6.6.2 Allowable Uses in the Inner Zone
- 6.6.3 Allowable Uses in the Outer Zone
- 6.7 Allowable Disturbances
- 6.7.1 Inner Zone
- 6.7.2 Outer Zone
- 6.8 Protection of Water Quality Buffers
- 6.8.1 During Construction
- 6.8.2 After Construction
- 6.8.3 Signage
- 6.9 Level Spreaders
- 6.10 Conflicts with State Requirements
Chapter 7 Stormwater Drainage Design (pdf)
- 7.1 Stormwater Drainage System Design
- 7.1.1 Drainage System Components
- 7.1.2 Checklist for Drainage Planning and Design
- 7.1.3 General Drainage Design Standards
- 7.2 Storm Drain Pipe Systems
- 7.2.1 Design Standards and Considerations
- 7.2.2 General Design Procedure
- 7.2.3 Capacity Calculations
- 7.2.4 Hydraulic Grade Lines
- 7.2.5 Minimum Grade
- 7.3 Culvert Design
- 7.3.1 Symbols and Definitions
- 7.3.2 Design Standards and Considerations
- 7.3.3 Design Procedures
- 7.3.4 Culvert Design Example
- 7.3.5 Design Procedures for Beveled-Edged Inlets
- 7.3.6 Flood Routing and Culvert Design
- 7.4 Open Channel Design
- 7.4.1 Open Channel Types
- 7.4.2 Symbols and Definitions
- 7.4.3 Design Standards and Considerations
- 7.4.4 Manning’s “n” Values
- 7.4.5 Uniform Flow Calculations
- 7.4.6 Critical Flow Calculations
- 7.4.7 Vegetative Design
- 7.4.8 Riprap Design for Lining Open Channels
- 7.4.9 Gradually Varied Flow
- 7.4.10 Rectangular, Triangular, and Trapezoidal Open Channel Design
- 7.5 Energy Dissipation Design
- 7.5.1 Overview
- 7.5.2 Symbols and Definitions
- 7.5.3 Design Guidelines
- 7.5.4 Riprap Aprons
- 7.5.5 Riprap Basins
- 7.5.6 Baffled Outlets
- 7.5.7 Level Spreaders
- 7.6 Minor Drainage System Design
- 7.6.1 Introduction and General Criteria
- 7.6.2 Symbols and Definitions
- 7.6.3 Street and Roadway Gutters
- 7.6.4 Stormwater Inlets
- 7.6.5 Grate Inlet Design
- 7.6.6 Curb Inlet Design
- 7.6.7 Combination Inlets
- 7.7 Bridge Hydraulics
- 7.7.1 Bridge Hydraulics Concepts
- 7.7.2 Computer Applications
Chapter 8 Floodplain and Sinkholes (pdf)
- 8.1 Introduction
- 8.2 Applicable Federal Regulations
- 8.2.1 National Flood Insurance Program
- 8.2.2 Community Rating System
- 8.3 Local Floodplain Management Tools
- 8.3.1 FEMA Flood Insurance Studies
- 8.3.2 Knox County Engineering Floodplain Mapping
- 8.3.3 Stormwater Master Plans
- 8.4 Floodplain Management Regulations
- 8.4.1 Summary of Ordinance Requirements for Development in Floodplains
- 8.4.2 Requirements for Land Use and Land Disturbance
- 8.4.3 Requirements for Engineering Studies
- 8.4.4 Requirements for Construction in Floodplains
- 8.5 Regulations for Development in Sinkhole Areas
- 8.5.1 Background
- 8.5.2 Regulations and Policies
Chapter 9 Construction Site Stormwater Management (pdf)
- 9.1 TN Construction General Permit
- 9.2 General Principles
- 9.3 Regulations and Policies
- 9.3.1 General
- 9.3.2 Protection of Water Quality Buffers
- 9.3.3 Stabilization of Disturbed Areas
- 9.3.4 Off-Site Sedimentation
- 9.3.5 Construction Sequencing
- 9.3.6 Structural Controls
- 9.3.7 Special Requirements Priority Construction Activities
- 9.3.8 Cut and Fill Slopes
- 9.3.9 Construction Exits
- 9.3.10 Good Housekeeping Practices
- 9.4 Erosion Prevention and Sediment Control Plans
- 9.4.1 Plan Modifications
- 9.5 Deficient Performance
- 9.6 Inspections and Maintenance
- 9.7 Small Lot EPSC Plans
Chapter 10 Pollution Prevention After Construction
- 10.1 Overview
- 10.2 Special Pollution Abatement Permit
- 10.3 Sediment Disposal for Structural BMP Maintenance